|
Afternoon all
I am doing some parallel testing of TM1 version 10.1 against 9.4 (both 64bit)
I have found some calculation differences, and fully expected them to be down to the volumes of data that I am working through, but I have stumbled upon something odd
When I try to right-click on a calculated value in my view in 10.1 the "Trace Calculation" and "Check Feeders" options are greyed out - but both are present in 9.4. The views I am checking are identical, and the calculated values are not consolidated in any way. I have done the same check on multiple views - all with the same result. The even weirder behaviour is that the options aren't greyed out when the calculated value is zero!
I can see why the rules aren't working - feeders are coming through I think - but I can't check. I have got PersistentFeeders set to F (as well as ParallelInteraction) so as to mirror the 9.4 environment as best as I could for now
Anyone any ideas ?
Thanks |
|